19 March 2017

It was a fairly uneventful work week, if by uneventful you mean a snow-day in mid-March. Three people made it to the office on Tuesday: I was one of them. We have an external vendor event on Tuesdays, and while it *can* be put off in an emergency, an inch or three of snow doesn’t stop me from getting the job done. I did my early morning work remotely, then spent about 45 minutes shoveling the driveway and sidewalks. Then off to work, and stayed there from 9 to 12.

*      *      *

The weekend, though, has been fun. I started out Saturday with a few chores and coffee roasting. Then I went over to one of the local lumberterias to pick up the materials I needed to build Marcia’s new closet system. Clearly, I chose the right transport for the job:

The right tool for the job - BMW M235i for the lumber run.

The right tool for the job

I unloaded the car, and broke down the long boards in the garage to rough design length before hauling downstairs. That pine is going to be the slats on the shelves, eventually.

*      *      *

Yesterday evening, we went over to Annapolis Shakespeare, in their new digs, for an evening cabaret of show tunes and sonnets. It was a lovely two hours of show, followed by a spot of mingling with cast, crew, and audience. Great fun. Next up with ASC: Alice In Wonderland (I think. It may be Richard III, in May … getting a new theatre operational is challenging).

*      *      *

Today, after the shopping, I went down to the woodshop and started making jigs, in order to repeatably make the parts that will end up being part of Marcia’s new closet:

Fabricating main supports using a 30° jig

Fabricating main supports

Much of the initial work was done on the table saw, for both the main supports and the backing wall attachments. Eventually I also hauled out the mitre saw for some angle cuts and working with the poplar I used for creating the supports for the hanger bars. Those got a through-hole put in them with a 1.32″ Forstner bit (in a specific location via stops), then cut to the right size on the miter saw, then a bunch of slots, etc. cut in batches on the table saw. The final bit before assembly was to round over all the outward facing corners, freehand, with a round-over bit on the router table.

Hanger bar supports in process

Hanger bar supports in process

I finished up the day gluing, pinning, and screwing the main support assemblies together. Here they are with spare parts: When I make a batch of identical parts, I’ve found it’s a good idea to make a spare or two while the setup is together. That way, if I ruin a piece, I don’t have to setup to make just one more. It costs little bit in materials, but saves a bunch of time in case of mistakes. Not to mention I’ve got templates to work from if I decide to build something similar again.

Support assemblies completed

Support assemblies completed

What’s next for those is to cut and add some slat attachment surfaces along the top edge of those supports, then sand and finish them. Then I’ll make the slats themselves. Everything will get sanded, stained, and a coat or three of poly. THEN we can dismantle Marcia’s closet, patch the walls, sand, paint, and assemble the new closet system. It’ll be a while, yet. But the job is finally started, so we’ve got that going for us.

*      *      *

DoD announced no new casualties in the last week. We are grateful for that. Ciao!

 

 

 

Bookmark the permalink.

About bilborg

I am who I am, there's plenty of data on this site to tell you more. Briefly, I'm a husband, computer geek, avid reader, gardener, and builder of furniture.

Comments are closed.