The heat and humidity have properly settled in, here in the formerly malarial DC Metro area. I’m trying not to let it slow me down. I took a few hours off work on Friday, and spent most of them working in the wood shop. I final-sanded all of the carcasses, drawer boxes, and fronts. Then I hauled all of those out into the “junk” area just outside my woodshop, so that I could clean the shop up.
Carcasses and boxes
I always build for a while, then clean massively before starting to apply finishes. It’s a bit of a pain, but it keeps the shop cleaner than it might otherwise be. I draped the saw, and started painting the drawer/door fronts.
Saturday, I continued with the finishing at intervals, but spent most of the morning and early afternoon hours doing yardwork – weeding and lawns, front and back. The best news from that angle? Starting to be some proper joy in the back yard, Tomatoes!
Finally: 2013 Tomatoes
With such a late start to the planting this year, I guess I’m not surprised that we’re only getting tomatoes out starting in mid-July … but only cherry tomatoes so far, not even a hint of red in anything big enough to start making salsa or red sauce with. Sad face. By evening, we had a big storm blow through, and when it was done, we didn’t have phone or Internet service. TV, yes. Same pipe for all three, but #WTF! A long phone call and a bunch of power-cycle events later, the VZ bloke determined a truck roll was necessary, but that wouldn’t be happening until Monday.
Hmmmm. I’m on call, AND I have weekend production system patching that needs doing! I sloughed off the on call status to my boss, and shed Saturday night’s patch and reboot onto the junior admin. I then set my alarm for 0615, and was at work by 0700 this morning, patching the rest of the systems that needed attention. Back home, a spot of breakfast, then off to the shopping. By the time I was home again, and down applying coats of poly in the shop, when I heard the house phone ring. Huh? I looked in my wiring closet, and the WAN link was back on my router. I called. VZ didn’t have an explanation for how they were able to remotely fix a problem that had needed a truck roll twelve hours before … but I’m just happy to have comms and connectivity back.
The balance of today was spent cooking a big pot of chili (serrano and habanero chilies from the garden for that), and alternately sanding then overcoating with poly for the drawer/door fronts.
Finishing up door/drawer fronts
I still have to distress those, and apply a bit of tactical staining, but they’re nearly done. By Tuesday I should be able to start applying finish to the boxes, and those don’t need a lot. It’s times like this that I wish I had enough room for a spray booth.
* * *
In yet more pleasant news, I have no new casualty reports to pass on from the DoD news release site. Still, it’s a good moment to stop and think about the dedication and resolve that our fighting men and women out at the pointy end of the stick display as they face the world on our behalf. You do us proud!